datasheetbank_Logo
Integrated circuits, Transistor, Semiconductors Search and Datasheet PDF Download Site

B1023 View Datasheet(PDF) - Unspecified

Part Name
Description
View to exact match
B1023
ETC1
Unspecified ETC1
B1023 Datasheet PDF : 24 Pages
1 2 3 4 5 6 7 8 9 10 Next Last
4 Connect to the compresser.
• Use filtered air without any dust,
oil and moisture.
• With the trigger pulled and air
flowing, adjust the regulator air
pressure to 490kPa(5.0kgf/cm2).
Connections
Tubing:
Station
must have a diameter of more
than ø0.17 in. and a length of
less than 9.5 ft.
CAUTION
The absorption power of the unit will
be reduced if adjustment is made
while air is not flowing or if the tube is
not measured as specified.
Do not set the regulator to pressure
of 882kPa (9kgf/cm2) or more while
the trigger is not pulled, as such
pressures can damage various parts
of the HAKKO 475 station.
5 Power switch
• Confirm that the power switch is
set in the OFF position, then con-
nect the power plug to the power
source.
CAUTION
The entire unit is constructed of con-
ductive materials. Always ground the
unit.
• Turn the power switch to ON.
The power lamp should light up.
• The nozzle begins to heat up
as soon as the power switch is
turned to ON.
6 After turning the power
switch to ON, wait 3
minutes before beginning
desoldering operations.
Male Connector:
pipe thread 1/8
Regulator:
adjust to
490kPa
(5.0kgf/cm2)
Air Filter:
Compressor
filter out dust,
oil and moisture.
CAUTION
Use the air filter. Dust, oil and
moisture can adhere to
the solenoid valve in the pipe
without it. This may result in
damage to the unit.
The power lamp
lights up.
The power lamp doesnʼt light
up.
1. Is the power cord properly con-
nected?
2. Is the fuse blown?
The nozzle heats up.
The nozzle doesnʼt heat up.
1. Is the cord assembly properly
connected?
2. Is the heating element broken?
CAUTION : The desoldering gun must be placed in the
iron holder when not in use.
6
 

Share Link: 

datasheetbank.com [ Privacy Policy ] [ Request Datasheet ] [ Contact Us ]